Deploying disaster recovery- New application installation
This section includes the following topics:
Related information
Section VI. Disaster Recovery
Tasks for a new disaster recovery installation - additional applicationsTasks for setting up DR in a non-shared storage environmentNotes and recommendations for cluster and application configurationReviewing the configurationConfiguring the storage hardware and networkAbout managing disk groups and volumesSetting up the secondary site- Configuring SFW HA and setting up a clusterVerifying that your application or server role is configured for HA at the primary siteSetting up your replication environmentAssigning user privileges (secure clusters only)About configuring disaster recovery with the DR wizardCloning the storage on the secondary site using the DR wizard (Volume Replicator replication option)Creating temporary storage on the secondary site using the DR wizard (array-based replication)Installing and configuring the application or server role (secondary site)Cloning the service group configuration from the primary site to the secondary siteConfiguring the application service group in a non-shared storage environmentConfiguring replication and global clusteringCreating the replicated data sets (RDS) for Volume Replicator replicationCreating the Volume Replicator RVG service group for replicationConfiguring the global cluster option for wide-area failoverVerifying the disaster recovery configurationEstablishing secure communication within the global cluster (optional)Adding multiple DR sites (optional)Possible task after creating the DR environment- Adding a new failover node to a Volume Replicator environmentMaintaining- Normal operations and recovery procedures (Volume Replicator environment)Recovery procedures for service group dependencies