Pre-requisites for performing high availability and disaster recovery operations
You must ensure the following before performing high availability and disaster recovery operations :
-
The Veritas InfoScale Operations Manager 3.0, or later managed host package must be installed. It is recommended to install Veritas InfoScale Operations Manager 8.0 managed host package to get the latest features.
-
The managed host must be managed by a Management Server.
-
Cluster Server must be configured and running on the managed host.
For best results, it is recommended that all the nodes in the cluster must be managed by Management Server. However, this is not mandatory.
More Information
Related information