Editing a fire drill schedule
In the Management Server console, you can edit the schedules that you have created for running a high availability (HA) or a disaster recovery (DR) fire drill. You can identify the HA and the DR fire drills from the Category column in this page.
To perform this task, your user group must be assigned the Admin or Operator role on the service group or the Availability perspective. The permission on the service group may be explicitly assigned or inherited from a parent Organization or cluster.
To modify a fire drill schedule
-
In the Management Server console, go to the Availability perspective and selectManage in the left pane.
-
Expand the Organization or Uncategorized Clusters to locate the cluster.
-
Expand the cluster and select the Service groups node.
-
Select Fire Drill Schedules tab.
-
In the schedules list, right-click on the required fire drill schedule. Select Edit.
-
In the Edit Schedule wizard panel, edit the schedule to run the fire drill. Click OK.
-
In the Summary panel, verify the selections that you have made. Click Finish.
-
In the Result panel, click OK.
More Information
Edit Schedule panel options
Summary panel options
Edit Schedule panel options
Related information
Running fire drills
../../section-iv-managing-high-availability-and-disaster-recovery-configurations/running-fire-drills/editing-a-fire-drill-schedule/edit-schedule-panel-options.md